Mobile

Address

Lehota 979, 951 36 Lehota

04

— Services

Construction waste recycling

Collection of construction waste straight from site and its handover for recycling — rubble, concrete, brick and surplus excavated soil.

Ryha pripravená na uloženie chráničky

Scope of work

Construction waste from excavation, service connections or demolition is collected straight from site and handed over for recycling. For the client that means one contractor for the groundworks and for the waste they leave behind — and material that goes back into construction instead of to landfill.

  • Rubble and construction waste removed from site
  • Surplus excavated soil collected
  • Concrete, brick and mixed construction and demolition waste
  • Waste handed over for recycling, not landfilled
  • Handover record for the site waste log
  • Follows on from our groundworks and excavation

What we take

Scope, timing and price are confirmed after a site visit.

Rubble and construction waste concrete, brick, mixed waste
Excavated soil surplus from groundworks
Collection straight from site
Processing handed over for recycling
Record waste handover confirmation

From the site visit to the handover record

How it works

Before collection we agree what the waste is and how much of it there is — that decides the equipment and the number of trips. The waste is loaded on site, taken away and handed over for recycling. You receive a record of that handover, which serves as the basis for the site waste log.

Recycling also makes economic sense: sorted material can be used again as bedding, backfill or sub-base rather than ending up in landfill. It works out most simply when collection is arranged together with the groundworks, because the waste leaves as it arises instead of piling up on site.

01 Site visit We establish the type and volume of waste and agree a collection date.
02 Loading The waste is loaded on site, without holding up the rest of the work.
03 Removal We haul it from site for further processing.
04 Handover record The handover is confirmed in writing for the waste log.